Cooling tower packing

Cross-flow Fill for High-Efficiency Tower Applications

WhatsApp QR Code WhatsApp QR
WeChat QR Code WeChat QR
Product Description

16mm & 19mm Pitch Cross-flow Fill for High-Efficiency Tower Applications

This cross-flow Cooling Tower Fill is designed for projects that require a combination of practical dimensions and multiple configuration choices. It is available in 1340mm and 1350mm widths, with 16mm and 19mm pitch options.

Product Specifications

Width1340mm, 1350mm
LengthCustomized
ThicknessCustomized
Pitch16mm, 19mm
Angle5.5°
MaterialPVC, CPVC, PP

Two Pitch Options

The availability of 16mm and 19mm pitch configurations provides greater flexibility for different cross-flow Cooling Tower Fill requirements. Customers can specify the required pitch together with the desired width and dimensions.

Consistent 5.5° Configuration

Both available widths use a 5.5° angle, maintaining a consistent structural configuration across the product range while allowing different pitch specifications.

Material Choices for Industrial Projects

The fill is available in PVC, CPVC, and PP. These material choices allow the product range to cover different industrial cooling tower project requirements.

Customized Dimensions

Length and thickness can be customized instead of being restricted to one fixed specification. This allows the fill to be prepared according to the dimensions required for a particular project.

Built for Flexible Project Configuration

With two widths, two pitch options, customized length and thickness, and three material choices, this cross-flow fill provides a flexible product configuration for industrial cooling tower applications.

For a project quotation, customers can provide the required width, length, thickness, pitch, and material so the appropriate configuration can be confirmed before production.

User Reviews
Michael Schneider
Michael Schneider
Cooling System Engineer

We purchased PVC film fill and drift eliminators for our industrial cooling tower project. The quality of the cooling tower fill was consistent, and the dimensions matched our requirements perfectly. The supplier provided professional technical support during the selection process and delivered the products on schedule. We appreciate their reliable communication and stable product performance.

Ahmed Al Mansouri
Ahmed Al Mansouri
Mechanical Equipment Consultant

We used their cooling tower packing materials for a commercial cooling system upgrade project. The products arrived well packed and without damage. The supplier showed good knowledge of cooling tower applications and helped us choose suitable fill materials according to our operating conditions.

Park Min Jae
Park Min Jae
Project Procurement Specialist

We have cooperated with this manufacturer for cooling tower fill materials for our replacement projects. Their cross flow fill and corrugated fill products have stable quality and good forming accuracy. They understand industrial requirements and can provide customized solutions according to different cooling tower models.

Anan Chaiwat
Anan Chaiwat
Maintenance Manager

Our cooling tower needed replacement fill media due to long-term operation. We selected their PP fill media after technical discussion. The new cooling tower fill improved water distribution and helped restore the cooling efficiency of our system. The ordering process was smooth, and the team was very responsive to our questions.

Hot Products
Fully Customizable Counter-flow Cooling Tower Fill
1. Fully Customizable Counter-flow Cooling Tower Fill Over
300/600mm Dual-width Counter-flow Fill
1. 300/600mm Dual-width Counter-flow Fill Introduction Ef
12mm Pitch Cooling Tower Fill
1. 12mm Pitch Cooling Tower Fill Introduction Compact Sur
750/950mm Dual-width Cross-flow/Counter-flow Fill
1. 750/950mm Dual-width Cross-flow/Counter-flow Fill Overv
FAQ
Do you offer cooling tower fill installation support?
We can assist with technical guidance and recommend experienced service partners worldwide. On-site support from our engineers may also be arranged according to project requirements.
What Is The Production Schedule For Cooling Tower Fill Media?
Standard production time is about 5–7 weeks after order approval, depending on specifications and customization needs. Flexible arrangements can be discussed for urgent project schedules.
Does your cooling tower fill media meet fire resistance requirements?
Yes, standard PVC cooling tower fill media is designed with flame-resistant properties for common operating conditions. Additional material options can be discussed according to specific project requirements.
What operating conditions can your cooling tower fill media support?
Our cooling tower fill media is designed for different cooling environments with reliable heat transfer performance. Customized fill designs can be developed according to specific tower structures and project operation requirements.
Send Us a Message
Code
Need help? Chat with us!